feat(benchmark): enhance benchmark documentation and add emulated run details
fix(benchmark): update deterministic checks and improve measurement accuracy fix(service): refine candidate recording and enhance balance assignment logic test(service): add test for balance recording with preference assignment
This commit is contained in:
1 parent
ff86cf48b4
commit
f1f08356df
5 files changed
+300
-98
No files matched your search
@@ -16,11 +16,14 @@ stage and incumbent are retained.
|
||||
battery level.
|
||||
- Use a cool phone, unplugged, with other applications closed. Record whether
|
||||
the device became warm or throttled during the run.
|
||||
- Run the benchmark three times after one warm-up run. Do not interact with
|
||||
the page while a run is active.
|
||||
- Representative and loaded scenarios should normally complete below five
|
||||
seconds; every scenario must return within ten seconds. These are release
|
||||
measurements, not CI timing assertions.
|
||||
- Tap **Run benchmark** once. It first runs every scenario as an unreported
|
||||
warm-up, then records three measured repetitions per scenario. Do not interact
|
||||
with the page while a run is active. The first measured result is the
|
||||
determinism baseline; later repetitions report whether they match it.
|
||||
- The original target was below five seconds for representative and loaded
|
||||
scenarios, with a ten-second planning ceiling for every scenario. The owner
|
||||
accepted six to seven seconds for the loaded scenario on 2026-09-25. These
|
||||
are release measurements, not CI timing assertions.
|
||||
- Keep the copied report unchanged, including any incomplete outcomes or
|
||||
hardware limitations. No mobile-device measurement is claimed by the source
|
||||
tree until a human records it here.
|
||||
@@ -29,3 +32,43 @@ The browser page uses the same `createPlanningCalculation(request)` context as
|
||||
the calendar and adds no solver or backend dependency. The ten-second release
|
||||
ceiling applies to planning latency; trace delivery is reported separately and
|
||||
cannot replace a valid planning outcome.
|
||||
|
||||
## Hardware status
|
||||
|
||||
No reference-phone run has been recorded. The project owner elected to close
|
||||
the release tickets on 2026-09-25 using the emulated run below, accepting its
|
||||
six-to-seven-second loaded planning time and the observed post-result trace UI
|
||||
pause. This is an explicit release exception, not a reference-phone measurement
|
||||
or proof of physical-device responsiveness.
|
||||
|
||||
## Emulated browser run — 2026-09-25
|
||||
|
||||
Chromium 149.0.7827.55 on an AMD Ryzen 7 7800X3D (x86_64), headless at
|
||||
412×915 pixels, device scale 2.625, touch enabled, and 4× CPU throttling.
|
||||
One full warm-up was excluded, followed by three measured repetitions. All
|
||||
five scenarios returned within ten seconds of planning time and complete
|
||||
results matched across repetitions. The loaded year took 5.74–6.17 seconds,
|
||||
above the five-second target. A 100 ms main-thread timer observed a maximum
|
||||
extra delay of 5,950.9 ms. Worker event timestamps place the four loaded-year
|
||||
pauses of 4.0–6.0 seconds after their planning results, around delivery of
|
||||
full trace artifacts. This desktop emulation does not establish reference-phone
|
||||
performance or responsiveness.
|
||||
|
||||
```tsv
|
||||
scenario repetition preparation_ms planning_ms trace_delivery_ms wall_ms outcome last_stage placements deterministic trace_status trace_candidates
|
||||
representative year 1 0.0 443.7 624.7 1069.1 Plan dates 30 baseline ready 29451
|
||||
representative year 2 0.1 490.0 609.3 1099.4 Plan dates 30 yes ready 29451
|
||||
representative year 3 0.1 465.5 614.2 1079.8 Plan dates 30 yes ready 29451
|
||||
typed obligations 1 0.0 157.0 261.2 418.2 Plan dates 10 baseline ready 13103
|
||||
typed obligations 2 0.0 162.6 255.6 418.2 Plan dates 10 yes ready 13103
|
||||
typed obligations 3 0.0 163.4 258.2 421.6 Plan dates 10 yes ready 13103
|
||||
chained earned entitlements 1 0.0 45.3 1.0 47.0 Plan dates 3 baseline ready 27
|
||||
chained earned entitlements 2 0.1 44.5 0.9 45.5 Plan dates 3 yes ready 27
|
||||
chained earned entitlements 3 0.1 44.4 0.8 45.4 Plan dates 3 yes ready 27
|
||||
deliberate conflict 1 0.0 92.8 0.9 93.8 PlanningConflict 0 baseline ready 366
|
||||
deliberate conflict 2 0.0 44.7 0.2 44.9 PlanningConflict 0 yes ready 366
|
||||
deliberate conflict 3 0.0 43.5 0.6 44.1 PlanningConflict 0 yes ready 366
|
||||
loaded year 1 0.3 5901.5 5677.7 11581.0 Plan dates 144 baseline ready 865117
|
||||
loaded year 2 0.8 6167.5 7582.4 13752.4 Plan dates 144 yes ready 865117
|
||||
loaded year 3 0.6 5738.3 6219.5 11962.5 Plan dates 144 yes ready 865117
|
||||
```
|
||||