Pin Bun 1.4.3 with packageManager, and force every bun run script onto
the Bun runtime through bunfig so ng, ESLint and Prettier never fall
back to an installed Node. Type checking uses bun check for the
application and test projects, next to the Angular build.
CI jobs install the pinned release from a checksum-verified download
instead of npm and run project steps in a shell without Node on PATH,
which stays available only for the checkout and upload actions. The
image test's fake docker runs on Bun.
Refs #290, #293
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace Vitest with bun test across the whole suite. A preload compiles
components through Angular's JIT transform with inlined templates, sets
up jsdom, TestBed and zoneless change detection, and a small shim covers
the Vitest APIs bun:test lacks. Files run isolated, real-worker specs
spawn the running Bun, and line coverage from lcov is converted to the
existing HTML and Cobertura reports. The CI benchmark replaces its heap
cap with a container memory limit. Vitest, Jest, Nx and their Vite
configuration are removed.
Refs #291
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The first PR run landed on srvhome, about 1.9 times slower than
nessar-desktop. The fixed 300-second timeout killed its protocol during the
loaded year, although every completed scenario was within its relative
budget. Raise the CI timeout to 600 seconds and the test timeout to 570
seconds so they only guard against hangs, and record the first CI-runner
ratios.
Refs #285
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Before the protocol, time the frozen engine on the two-year scenario, best
of three, and fail any scenario whose mean planning time exceeds its
multiplier times that calibration. Multipliers come from development-machine
ratios with about 1.5x headroom until #286 tightens them. The 300-second
timeout stays only as a hang guard. The benchmark keeps running on push and
pull_request events because the push run gates image publication.
This replaces the absolute 300-second acceptance protocol named in #78.
Refs #285
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Reduce objective evaluation and calendar allocation work while preserving planner outcomes and deterministic explanations. Restore required benchmark gating and record the unchanged protocol, differential checks, and browser evidence for #78.