fix(benchmark): update deterministic checks and improve measurement accuracy fix(service): refine candidate recording and enhance balance assignment logic test(service): add test for balance recording with preference assignment
Mobile leave-planner benchmark
Open the deployed application at /benchmark on the reference phone. Tap
Run benchmark, wait for the five scenarios to finish, then tap Copy
report and save the tab-separated output with the date and build identifier.
The harness measures preparation, planning-to-outcome latency, later trace
delivery, and total wall time separately. It records the outcome, last
completed quality stage, placement count, determinism, trace status, and trace
candidate count. PlanningIncomplete is not a conflict: its last completed
stage and incumbent are retained.
Protocol
- Record phone model, OS version, browser/version, application build, and battery level.
- Use a cool phone, unplugged, with other applications closed. Record whether the device became warm or throttled during the run.
- Tap Run benchmark once. It first runs every scenario as an unreported warm-up, then records three measured repetitions per scenario. Do not interact with the page while a run is active. The first measured result is the determinism baseline; later repetitions report whether they match it.
- The original target was below five seconds for representative and loaded scenarios, with a ten-second planning ceiling for every scenario. The owner accepted six to seven seconds for the loaded scenario on 2026-09-25. These are release measurements, not CI timing assertions.
- Keep the copied report unchanged, including any incomplete outcomes or hardware limitations. No mobile-device measurement is claimed by the source tree until a human records it here.
The browser page uses the same createPlanningCalculation(request) context as
the calendar and adds no solver or backend dependency. The ten-second release
ceiling applies to planning latency; trace delivery is reported separately and
cannot replace a valid planning outcome.
Hardware status
No reference-phone run has been recorded. The project owner elected to close the release tickets on 2026-09-25 using the emulated run below, accepting its six-to-seven-second loaded planning time and the observed post-result trace UI pause. This is an explicit release exception, not a reference-phone measurement or proof of physical-device responsiveness.
Emulated browser run — 2026-09-25
Chromium 149.0.7827.55 on an AMD Ryzen 7 7800X3D (x86_64), headless at 412×915 pixels, device scale 2.625, touch enabled, and 4× CPU throttling. One full warm-up was excluded, followed by three measured repetitions. All five scenarios returned within ten seconds of planning time and complete results matched across repetitions. The loaded year took 5.74–6.17 seconds, above the five-second target. A 100 ms main-thread timer observed a maximum extra delay of 5,950.9 ms. Worker event timestamps place the four loaded-year pauses of 4.0–6.0 seconds after their planning results, around delivery of full trace artifacts. This desktop emulation does not establish reference-phone performance or responsiveness.
scenario repetition preparation_ms planning_ms trace_delivery_ms wall_ms outcome last_stage placements deterministic trace_status trace_candidates
representative year 1 0.0 443.7 624.7 1069.1 Plan dates 30 baseline ready 29451
representative year 2 0.1 490.0 609.3 1099.4 Plan dates 30 yes ready 29451
representative year 3 0.1 465.5 614.2 1079.8 Plan dates 30 yes ready 29451
typed obligations 1 0.0 157.0 261.2 418.2 Plan dates 10 baseline ready 13103
typed obligations 2 0.0 162.6 255.6 418.2 Plan dates 10 yes ready 13103
typed obligations 3 0.0 163.4 258.2 421.6 Plan dates 10 yes ready 13103
chained earned entitlements 1 0.0 45.3 1.0 47.0 Plan dates 3 baseline ready 27
chained earned entitlements 2 0.1 44.5 0.9 45.5 Plan dates 3 yes ready 27
chained earned entitlements 3 0.1 44.4 0.8 45.4 Plan dates 3 yes ready 27
deliberate conflict 1 0.0 92.8 0.9 93.8 PlanningConflict 0 baseline ready 366
deliberate conflict 2 0.0 44.7 0.2 44.9 PlanningConflict 0 yes ready 366
deliberate conflict 3 0.0 43.5 0.6 44.1 PlanningConflict 0 yes ready 366
loaded year 1 0.3 5901.5 5677.7 11581.0 Plan dates 144 baseline ready 865117
loaded year 2 0.8 6167.5 7582.4 13752.4 Plan dates 144 yes ready 865117
loaded year 3 0.6 5738.3 6219.5 11962.5 Plan dates 144 yes ready 865117