Files
vac-optimizer/docs/benchmark/README.md
T
nessarandClaude Opus 5.5 94d57add2c test: run the suite and benchmark with Bun's native test runner
Replace Vitest with bun test across the whole suite. A preload compiles
components through Angular's JIT transform with inlined templates, sets
up jsdom, TestBed and zoneless change detection, and a small shim covers
the Vitest APIs bun:test lacks. Files run isolated, real-worker specs
spawn the running Bun, and line coverage from lcov is converted to the
existing HTML and Cobertura reports. The CI benchmark replaces its heap
cap with a container memory limit. Vitest, Jest, Nx and their Vite
configuration are removed.

Refs #291

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 13:40:42 +02:00

441 lines
29 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Mobile leave-planner benchmark
## Composable optimization rules: current verification status
[Issue #78](https://gitea.nessar.fr/nessar/vac-optimizer/issues/78) passes the
unchanged Node acceptance protocol on the documented development laptop:
**298.6 seconds**, including one warm-up and two measured repetitions of all
seven scenarios, without coverage, with one worker and a 2 GiB Node heap.
The full protocol keeps a 600-second timeout only as a hang guard (see
[Relative CI gate](#relative-ci-gate)). All expected outcomes,
placement counts, final stages and determinism checks pass. The fixture inputs
are unchanged; the test now prints its existing report.
## Relative CI gate
The relative gate replaces the 300-second acceptance protocol named in
[#78](https://gitea.nessar.fr/nessar/vac-optimizer/issues/78) as the benchmark
policy. This is an explicit policy change from #279/#285: runners differ in
speed, so a fixed wall-clock limit was flaky.
Before the protocol, in the same process, the spec times the frozen engine
(`src/app/services/frozen-engine/leave-planner.core.frozen.mjs`, the engine at
a871f8f) on the `two years` scenario, best of three, and prints the result.
Each scenario's budget is its multiplier times that calibration; the mean
`planningMs` of its two measured repetitions must not exceed it. A scenario
without a multiplier fails too. `#286` tightens the multipliers once the speed
target is met.
The job log shows a Markdown table with one row per scenario, printed as soon
as that scenario finishes. Each row gives both measured planning times, their
mean, the budget, the ratio to the calibration, the multiplier, the outcome,
placements, determinism and `ok`, `OVER` or `no budget`. The complete
tab-separated report follows the table.
| Scenario | Mean planning (s) | Ratio to calibration | Multiplier |
| --------------------------- | ----------------- | -------------------- | ---------- |
| representative year | 0.40 | 0.15 | 0.25 |
| typed obligations | 5.02 | 1.83 | 3 |
| chained earned entitlements | 0.025 | 0.01 | 0.05 |
| deliberate conflict | 0.013 | 0.005 | 0.05 |
| loaded year | 44.3 | 16.2 | 25 |
| two years | 1.84 | 0.67 | 1 |
| three years | 5.94 | 2.17 | 3.5 |
Ratios come from the development machine (calibration about 2.74 s); the
multipliers add roughly 1.5x headroom, rounded up, with a floor of 0.05 for the
two tiny scenarios. A failure lists, per scenario, the measured mean, the
budget, the multiplier and the calibration in milliseconds.
The first CI runs of PR #287 (commit `63b50c4`) give consistent ratios on two
runners:
| Scenario | nessar-desktop | srvhome |
| --------------------------- | -------------- | ------- |
| calibration | 3.03 s | 5.71 s |
| representative year | 0.17 | 0.14 |
| typed obligations | 1.83 | 1.75 |
| chained earned entitlements | 0.011 | 0.005 |
| deliberate conflict | 0.006 | 0.003 |
| loaded year | 16.6 | killed |
| two years | 0.65 | killed |
| three years | 1.99 | killed |
srvhome is about 1.9 times slower than nessar-desktop, so its whole protocol
needs roughly 400 seconds. The original 300-second `timeout` killed it during
the loaded year, while every completed scenario was within budget. The CI
`timeout` is therefore 600 seconds and the test timeout 570 seconds. They are
only hang guards and do not judge speed; #286 lowers them once the speed
target is met.
The protocol now runs on Bun's test runner, outside coverage:
`timeout 600s bun test src/app/benchmark --timeout=600000`. JavaScriptCore has
no equivalent of Node's `--max-old-space-size`, so the CI benchmark job enforces
memory with a 3 GiB container limit instead of the former 2 GiB heap cap.
Scenarios, calibration, warm-up, repetitions, determinism checks and
multipliers are unchanged. One local run (Bun 1.4.3, Node unavailable) took
268 seconds and passed every scenario; the frozen-engine calibration was
3.79 s and the ratios were 0.14 (representative year), 1.43 (typed
obligations), 0.01 (chained earned entitlements), 0.00 (deliberate conflict),
17.50 (loaded year), 0.64 (two years) and 2.18 (three years). These are Bun
measurements; they do not establish browser or reference-phone speedups.
The post-removal functional integration checks, browser QA and unchanged-input
handoff for #78 are recorded in [the #77 verification report](../trace-free-planning-verification.md).
The benchmark is required again in Gitea Actions, including the image and
aggregate gates. [The #78 report](issue-78.md) records the baseline timeout,
profiling, before/after diagnostics, full protocol output, correctness checks
and browser limitations. That pass had only 1.4 seconds of external-timeout
headroom. Three later exact optimizations for PR #278 cut the Vitest duration
to **228.1 seconds** (71.9 seconds of headroom) in the most recent local run:
[direct date keys](pr-278-date-keys.md),
[immutable date counts](pr-278-immutable-date-counts.md) and
[mandatory-move prechecks](pr-278-mandatory-moves.md). Outcomes, explanations
and final states are unchanged. CI-runner performance and live workflow
validation remain unverified.
The existing migration protection stays in place under
[issue #268](https://gitea.nessar.fr/nessar/vac-optimizer/issues/268).
Before these optimizations, the trace-free integrated baseline at `2f4af14`
timed out after 300 seconds without a complete report. The #76 verification
previously passed 630 functional tests across 33 files with coverage under the
same heap setting, while its unchanged benchmark also timed out. Before the
Gitea migration, GitLab pipeline 320 passed 652 functional tests, but its
separate benchmark timed out as well. An earlier loaded-year warm-up took
184.36 seconds; that historical sample predates the final period-projection
cache and trace removal and is not a measurement of the current engine.
#75 owns functional saved-rule migration, #76 removes tracing, #77 verifies
retained behavior and #78 owns performance acceptance. No automatic elapsed-time
engine cutoff is introduced. No reference-phone run is claimed.
The measurements below describe earlier implementations and protocols. Their
trace counters and timings are historical; current evidence is in
[the #78 report](issue-78.md).
## Frozen-engine differential check
`src/app/services/frozen-engine.spec.ts` runs 5,000 seeded random planning
requests (seeds 280000 to 284999, one test per 200 seeds) through the current
engine and through a frozen copy of the engine at `a871f8f`, develop after
PR #278. For each request, the planning outcome, stable plan explanation,
explanation error and final-state snapshot must be strictly deep-equal,
including `PlanningConflict` and `InvalidInput` outcomes. Timings are not
compared.
Start dates span 2025 to 2027. About 15% of requests start in late December and
cross a year boundary, and about 15% start shortly before a weekday French
public holiday. Most horizons last 7 to 28 days; about 10% last 29 to 70 days
with optimization presets and at most one calendar rule. Requests cover
obligation and preference rules, `IF_THEN` rules with earned leave
entitlements, `TIME_WINDOW` rules, optimization presets in random order and
subsets, random composed optimization configurations, disabled rules, declared
non-working days and a few deliberately invalid requests. The last test fails
if an outcome kind, rule type, year-crossing horizon or public-holiday horizon
stops appearing. Requests stay small because candidate search grows quickly
with horizon length and balances; the slowest case takes about one second.
The fixture is `src/app/services/frozen-engine/leave-planner.core.frozen.mjs`,
a generated bundle with `date-holidays` left external, and its hand-written
`leave-planner.core.frozen.d.mts`. Rebuild it only for an intended behavior
change, in its own reviewed commit, from the commit that introduces the change:
```sh
bun build src/app/services/leave-planner.core.ts --target=node --external date-holidays --outfile src/app/services/frozen-engine/leave-planner.core.frozen.mjs
```
A failure prints the seed and the full request as JSON. To run only that seed:
```sh
FROZEN_ENGINE_SEED=<seed> bun test --isolate src/app/services/frozen-engine.spec.ts
```
The check runs in the functional suite. On the development laptop with Bun
1.4.3 it takes about 54 seconds with or without coverage
(`bun test --config=bunfig.coverage.toml --isolate src/app/services/frozen-engine.spec.ts`; coverage is line-level only).
A flipped objective direction in `compareObjectiveValues` made 26 of its tests
fail, starting at seed 280002; the change was reverted.
## Reference-phone protocol
Open the deployed application at `/benchmark` on the reference phone. Tap
**Run benchmark**, wait for the seven scenarios to finish, then tap **Copy
report** and save the tab-separated output with the date and build identifier.
The harness measures preparation, planning-to-outcome latency, planning work, and total wall time through stable explanation delivery. It also reports the largest extra delay of a 50 ms UI heartbeat, available main-thread heap, outcome, last completed quality stage, placement count and determinism. `PlanningIncomplete` retains its last completed stage and valid incumbent and is distinct from a conflict.
Issue #76 removes all trace timing, status and candidate-count columns, along with trace promises and delivery requirements. The seven scenarios, warm-ups, repetitions, 2 GB heap limit, 300-second timeout and performance gates are unchanged. #77 owns integrated functional verification; #78 owns performance acceptance and any necessary optimization.
## Protocol
- Record phone model, OS version, browser/version, application build, and
battery level.
- Use a cool phone, unplugged, with other applications closed. Record whether
the device became warm or throttled during the run.
- Tap **Run benchmark** once. It first runs every scenario as an unreported
warm-up, then records three measured repetitions per scenario. Do not interact
with the page while a run is active. The first measured result is the
determinism baseline; later repetitions report whether they match it.
- The scenarios include two and three calendar years with separately dated
annual CP and RTT balances. Let these runs finish or cancel explicitly;
there is no automatic calculation cutoff and no validated duration ceiling
for multi-year horizons. The historical annual targets and release exception
below do not establish multi-year performance.
- Keep the copied report unchanged, including any incomplete outcomes or
hardware limitations. No mobile-device measurement is claimed by the source
tree until a human records it here.
The browser page uses the same `createPlanningCalculation(request)` context as
the calendar and adds no solver or backend dependency. It omits `deadlineMs`.
Explanation delivery is independent of the outcome and cannot replace a valid plan.
`planning_ms` is the observed latency until the outcome is usable. `planning_work_ms` excludes observer callbacks and post-outcome explanation work. `wall_ms` includes preparation, outcome and explanation delivery. `max_ui_delay_ms` covers this entire interval; there is no decision recording, trace materialization or trace transfer.
`peak_main_thread_heap_bytes` is Chromium's available `performance.memory`
sample, taken alongside the 50 ms UI heartbeat. A blank value means this API is
unavailable. This measures the page's JS heap, excludes the worker heap, and is
not a claim about total application memory. For a browser profile, record the
isolated Chrome process-tree RSS separately during planning and subsequent
explanation delivery, including the worker and renderer. State the sampling interval,
CPU throttling, viewport, and whether a warm-up preceded each measurement.
For cancellation measurements, use the normal calendar with the same saved
two- or three-year dates and balances. Cancel during preparation and an active
optimization phase, using the keyboard in one run. Record request-to-outcome
latency separately from request-to-artifacts latency; verify the partial-plan
status or absence of a plan, one planning request, no placements before the
outcome, and delivery of its stable explanation. Confirm
that editing an input remains possible during active worker CPU work. These
measurements describe that device and workload; they impose no latency limit.
## Historical measurements before trace removal
The following records remain as evidence for their dated builds. Trace-related behavior and metrics below are superseded by issue #76.
### Hardware status
No reference-phone run has been recorded. The project owner elected to close
the release tickets on 2026-09-25 using the emulated run below, accepting its
six-to-seven-second loaded planning time and the observed post-result trace UI
pause. This is an explicit release exception, not a reference-phone measurement
or proof of physical-device responsiveness.
## Long-horizon calendar verification — 2026-10-05
Working implementation of issue #59 based on
`2edf2004f56f8a453a691846f3c0e6d960e27911`, using the production browser build,
native Chromium 149.0.7827.55 Web Workers, and an AMD Ryzen 7 7800X3D desktop.
The host ran Debian 13 under WSL2 (kernel 6.18.33.2-microsoft-standard-WSL2).
Headless browser emulation used 412×915 pixels, scale 2.625, touch enabled,
reduced motion, and 4× CPU throttling. Each scenario used a fresh browser and
one cold run, with no warm-up. Other validation commands were kept out of these
runs. This is desktop evidence, not a reference-phone performance claim.
The saved dates covered 2024-01-01 through 2025-12-31 or 2026-12-31 inclusive.
Each year supplied 20 CP and 10 RTT days available January 1 and expiring
December 31, matching the new benchmark scenarios. No technical deadline was
supplied. Both completed plans finished through the `dates` objective, consumed
all balances, and displayed no intermediate placements. The calendar appeared
before the full trace; its placement dates were identical after trace readiness,
and each flow sent exactly one planning request. All 1,949 and 3,956 trace
packets respectively were acknowledged, carrying 122,621 and 249,234 candidate
records without truncation. Heartbeats continued during the producing runs.
| Horizon | Calendar usable | Later trace delivery | Placements | Maximum UI timer delay before calendar / during trace | Peak page heap before calendar / during trace | Peak Chrome process-tree RSS before calendar / during trace |
| ----------- | --------------- | -------------------- | ---------- | ----------------------------------------------------- | --------------------------------------------- | ----------------------------------------------------------- |
| Two years | 5.08 s | 2.55 s | 60 | 1.47 s / 0.70 s | 22.7 / 314.6 MiB | 1,143.2 / 1,606.8 MiB |
| Three years | 10.86 s | 4.14 s | 90 | 2.11 s / 1.48 s | 22.9 / 597.6 MiB | 1,386.8 / 2,217.8 MiB |
A 50 ms page timer measured extra event-loop delay and sampled available
main-thread JS heap. RSS was sampled every 500 ms across that isolated Chrome
process tree, including browser, renderer, worker, and auxiliary processes;
it is resident process memory, not worker JS heap. The timer delays include
initial multi-year calendar rendering and later artifact work. These pauses
and memory costs remain visible limitations; no duration or responsiveness
threshold is inferred from these samples.
Two additional cold three-year runs used the same balances in dark mode.
Cancellation during preparation returned no plan and no obligation conflict.
Keyboard cancellation during the holiday-week pass retained a valid 90-placement
incumbent marked **Calcul annulé — plan partiel**, with `at-risk` as the last
completed stage. An editable input accepted focus while the worker remained
active. Both flows kept a 44 px Cancel control, fit the viewport without
horizontal overflow, and delivered the original trace after their outcome.
| Cancellation point | Request to outcome | Request to complete artifacts | Retained placements |
| ------------------------------------------ | ------------------ | ----------------------------- | ------------------- |
| Calendar preparation | 21.9 ms | 874.8 ms | 0 |
| Active holiday-week optimization, keyboard | 21.5 ms | 1,431.7 ms | 90 |
No browser errors occurred. Cancellation issued one cancel request and no
additional calculation. Separate tests cover late artifact errors and stale
outcomes, explanations, and traces, preserving the latest displayed plan.
Elapsed-time tests advance clocks beyond ten seconds without waiting in CI,
including inside the real bundled worker. The seven-scenario benchmark also
checks complete traces and repeated outcome determinism for both longer horizons.
## Indicative wait and complete horizon flow — 2026-10-05
Working implementation of issue #60, preserving the existing #59 worktree
changes, based on `2edf2004f56f8a453a691846f3c0e6d960e27911`. Production build,
native Chromium 149.0.7827.55 workers, AMD Ryzen 7 7800X3D, Debian 13.6 under
WSL2 (kernel 6.18.33.2-microsoft-standard-WSL2). Headless emulation used 412×915
pixels, scale 2.625, touch, reduced motion and 4× CPU throttling. External font
downloads were blocked. No other build or test workload ran during measurement.
These are desktop samples, not physical-phone results or accuracy guarantees.
Each scenario used a fresh browser. The application's initial calculation
covered one saved day with no balances or rules; that small completed plan was
the session's sole prior calibration sample. No target-scenario warm-up was
performed. Through the actual settings and balance controls, the run then
selected January 1, 2024 through the relevant December 31 inclusive and supplied
20 CP plus 10 RTT days per year, with annual availability and expiry dates.
The saved dates and balances were checked. All edits retained the initial
calendar and issued no calculation; one explicit Calculate click submitted the
complete target configuration.
Calendar wait was measured from the captured Calculate click to DOM observation
of the displayed final placements with the loading overlay removed. This
includes request scheduling, preparation and rendering, unlike a core-work
measurement. The later trace interval starts at that calendar endpoint and ends
at the worker's terminal artifact delivery. The application's own calibration
uses its request timestamp and `afterNextRender` endpoint as described in
[planning-duration.md](../planning-duration.md).
| Horizon | Range before Calculate (with one local sample) | Observed calendar wait | Additional trace delivery | Range after completion | Placements |
| ----------- | ---------------------------------------------- | ---------------------- | ------------------------- | ---------------------- | ---------- |
| One year | 1–4 s | 1.74 s | 1.23 s | 1–5 s | 30 |
| Two years | 2–16 s | 5.08 s | 2.88 s | 2–16 s | 60 |
| Three years | 7–44 s | 11.03 s | 5.60 s | 6–39 s | 90 |
All three outcomes completed through `dates`, with no intermediate placements,
implicit deadline, extra request or date movement. The three-year result
finished after ten seconds. Calendars and estimates remained identical during
the later trace interval. All 674, 1,948 and 3,959 trace packets respectively
were acknowledged. These isolated samples establish behavior, not a validated
numerical prediction error or duration ceiling. The rough model before any
local sample is separately documented; it does not assume linear growth with
the number of years.
Two dark-mode native-worker cancellation flows covered the same manually
submitted three-year configuration. Holding the new worker's script download
until the explicit Cancel click made cancellation before any valid plan
reproducible: no plan or conflict was presented, and the indicative 7–46 s range
was unchanged. Its empty original trace was already available when the calendar
rendered. A keyboard cancellation in active holiday-week optimization retained
90 placements, displayed **Calculation cancelled — partial plan**, and left its
7–44 s range unchanged through later trace delivery. Both Cancel controls were
44 px high, and balance inputs accepted focus while the calculation was active.
The controlled startup download is not cancellation-latency evidence.
A separate three-year run completed in 10.96 s while native trace-update events
were held back. The calendar was usable with an explicitly loading trace;
injecting a subsequent worker transport error preserved all 90 placements and
the newly refined 6–38 s estimate. Controlled-clock tests additionally keep a
trace unresolved for five minutes after a twenty-second calendar wait, verifying
that subsequent delivery/error time contributes no calibration sample.
No browser errors or horizontal overflow occurred. The annual flow also fit
375, 768 and 1440 px widths. The estimate uses the existing secondary-text
theme token and is associated with Calculate through `aria-describedby`.
Settings restoration, stale calculations, rule/balance edits, long-worker
liveness, and cancellation history are also exercised by the integration suite.
## Emulated browser run — 2026-09-25
Chromium 149.0.7827.55 on an AMD Ryzen 7 7800X3D (x86_64), headless at
412×915 pixels, device scale 2.625, touch enabled, and 4× CPU throttling.
One full warm-up was excluded, followed by three measured repetitions. All
five scenarios returned within ten seconds of planning time and complete
results matched across repetitions. The loaded year took 5.74–6.17 seconds,
above the five-second target. A 100 ms main-thread timer observed a maximum
extra delay of 5,950.9 ms. Worker event timestamps place the four loaded-year
pauses of 4.0–6.0 seconds after their planning results, around delivery of
full trace artifacts. This desktop emulation does not establish reference-phone
performance or responsiveness.
```tsv
scenario repetition preparation_ms planning_ms trace_delivery_ms wall_ms outcome last_stage placements deterministic trace_status trace_candidates
representative year 1 0.0 443.7 624.7 1069.1 Plan dates 30 baseline ready 29451
representative year 2 0.1 490.0 609.3 1099.4 Plan dates 30 yes ready 29451
representative year 3 0.1 465.5 614.2 1079.8 Plan dates 30 yes ready 29451
typed obligations 1 0.0 157.0 261.2 418.2 Plan dates 10 baseline ready 13103
typed obligations 2 0.0 162.6 255.6 418.2 Plan dates 10 yes ready 13103
typed obligations 3 0.0 163.4 258.2 421.6 Plan dates 10 yes ready 13103
chained earned entitlements 1 0.0 45.3 1.0 47.0 Plan dates 3 baseline ready 27
chained earned entitlements 2 0.1 44.5 0.9 45.5 Plan dates 3 yes ready 27
chained earned entitlements 3 0.1 44.4 0.8 45.4 Plan dates 3 yes ready 27
deliberate conflict 1 0.0 92.8 0.9 93.8 PlanningConflict 0 baseline ready 366
deliberate conflict 2 0.0 44.7 0.2 44.9 PlanningConflict 0 yes ready 366
deliberate conflict 3 0.0 43.5 0.6 44.1 PlanningConflict 0 yes ready 366
loaded year 1 0.3 5901.5 5677.7 11581.0 Plan dates 144 baseline ready 865117
loaded year 2 0.8 6167.5 7582.4 13752.4 Plan dates 144 yes ready 865117
loaded year 3 0.6 5738.3 6219.5 11962.5 Plan dates 144 yes ready 865117
```
## Exact-trace verification — 2026-10-03
Working changes based on `0ce33cc9d6fe7381965a9162571abe205d0b7350`,
Chromium 149.0.7827.55 on the same AMD Ryzen 7 7800X3D desktop,
412×915 pixels, device scale 2.625, touch enabled, and 4× CPU throttling.
One warm-up preceded three recorded repetitions. This is desktop emulation;
no physical-phone result is claimed, and the earlier release exception is not
used as evidence for this implementation.
All five scenarios matched their pre-change outcomes in a separate core
comparison, including traced versus untraced runs. Every repeated browser
outcome matched its first repetition. Each loaded run returned 144 placements
and retained all 868,919 actual trace candidate records with a ready trace.
Loaded planning work took 5.81–6.18 seconds, below its ten-second budget.
Observed outcome latency was 10.36–10.85 seconds, including trace capture;
this latency is distinct from the planning-work budget. Complete trace delivery
followed 24.09–25.10 seconds later. No evaluation was truncated to meet a timing
target. The worst extra delay of the 50 ms heartbeat was 946.8 ms across the
loaded runs, including report preparation, compared with 4.65–5.49 seconds
before acknowledged delivery in the same final-trace harness.
The worker stages snapshots during planning and delivers at most sixteen
64-operation packets before waiting for receiver acknowledgements. The
receiver applies bounded batches, releases consumed packets, and yields
between tasks. The worker stops after its terminal packet; benchmark helpers
keep completed trace references out of the next repetition. These changes
avoid the observed message-flood pauses and repeated-run renderer crashes.
The complete trace still requires substantial memory: a separate unthrottled
core profile retained approximately 1.06 GB of heap for the loaded trace.
These results do not establish physical-device performance.
A separate rendered-calendar run at the same emulated mobile size used twelve
balances of twelve days each. It produced 144 placements, 113 gained
non-working days, and a longest work sequence of five. Full trace navigation
and date comparison completed without browser errors. Maximum extra heartbeat
delays were 487.4 ms during planning and calendar rendering, 380.8 ms during
trace exploration, and 540.3 ms during comparison. Keyboard navigation,
dialog focus restoration, background comparison without an implicit modal,
and responsive widths of 375, 768, and 1440 pixels also passed.
The final suite passes 201 tests across 23 files, application and specification
type checks, ESLint, and the production build. Build warnings remain for the
2.55 MB initial bundle (2.50 MB warning budget) and 13.41 kB calendar stylesheet
(8.00 kB warning budget); hard budgets are not exceeded.
```tsv
scenario repetition preparation_ms planning_ms trace_delivery_ms wall_ms outcome last_stage placements deterministic trace_status trace_candidates max_ui_delay_ms planning_work_ms trace_capture_ms trace_materialization_ms trace_transfer_ms
representative year 1 0.0 622.4 716.9 1340.3 Plan dates 30 baseline ready 29296 18.2 265.0 256.4 7.4 166.4
representative year 2 0.0 593.5 695.8 1289.4 Plan dates 30 yes ready 29296 14.5 255.3 233.8 7.5 184.1
representative year 3 0.0 592.0 721.0 1313.2 Plan dates 30 yes ready 29296 11.5 256.1 234.4 9.2 191.8
typed obligations 1 0.1 259.7 324.3 584.6 Plan dates 10 baseline ready 13005 11.8 106.8 56.6 3.7 70.2
typed obligations 2 0.1 266.2 330.6 596.9 Plan dates 10 yes ready 13005 11.7 110.6 60.3 4.1 81.9
typed obligations 3 0.1 259.6 341.8 601.5 Plan dates 10 yes ready 13005 15.7 112.3 54.7 4.0 75.9
chained earned entitlements 1 0.1 94.5 3.0 97.6 Plan dates 3 baseline ready 15 0.8 3.4 1.3 0.9 0.3
chained earned entitlements 2 0.0 100.2 2.5 102.7 Plan dates 3 yes ready 15 0.2 3.6 1.4 0.7 0.1
chained earned entitlements 3 0.0 96.0 1.5 97.5 Plan dates 3 yes ready 15 0.1 3.2 1.5 0.7 0.1
deliberate conflict 1 0.0 94.4 2.4 96.8 PlanningConflict 0 baseline ready 4 0.2 0.9 0.8 0.3 0.2
deliberate conflict 2 0.0 93.2 1.0 95.0 PlanningConflict 0 yes ready 4 0.2 1.1 0.5 0.2 0.0
deliberate conflict 3 0.1 92.8 1.6 95.2 PlanningConflict 0 yes ready 4 1.4 1.0 0.7 0.2 0.1
loaded year 1 0.0 10852.1 25102.6 36002.9 Plan dates 144 baseline ready 868919 946.8 6014.8 4730.6 948.3 8862.1
loaded year 2 0.1 10364.4 24816.9 35216.6 Plan dates 144 yes ready 868919 791.2 5813.1 4440.6 296.7 8693.3
loaded year 3 0.1 10807.8 24089.4 34933.6 Plan dates 144 yes ready 868919 721.7 6176.0 4526.6 978.7 8408.0
```