With several obligation solutions, the planner ran the whole preference chain on candidate solutions as previews: every solution after a complete enumeration, or the eight best-ranked after a truncated window search. It now orders all solutions by the existing pre-preference ranking (active objectives, then tie-breaks, of each obligation-only plan; equal ranks keep enumeration order) and runs the preference stages once, on the first. If that run ends with earned leave available only after its final merged time-off period, the stages restart on the next solution, so a request that planned before never becomes a conflict. The loaded year drops from 43 to 5.5 seconds and typed obligations from 3.3 to 0.1 seconds, with byte-identical benchmark plans. Over the 5,000 seeded requests, 23 plans become worse (9 on a real objective) and 1 better; over 50 loaded-year-sized requests, 4 become worse on a real objective. ADR 0010 records the decision; docs/benchmark/issue-302.md records the comparison and the opt-in runner that reproduces it. The frozen-engine check fails until the frozen engine is rebuilt from this commit in the next one. Part of #302. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
10 lines
1.6 KiB
Markdown
10 lines
1.6 KiB
Markdown
# Constraint-First Lexicographic Planning Without a Solver Dependency
|
|
|
|
The ten-second automatic deadline is superseded by [ADR 0006](0006-user-selected-horizons-and-cancellable-calculations.md), implemented by issue #59. Technical callers can still opt into an explicit planning-work budget; the user flow has no automatic cutoff.
|
|
|
|
The five-second target is revisited by [ADR 0010](0010-rank-obligation-solutions-before-preferences.md), which sets local benchmark targets of ten seconds for the loaded year, five seconds for multi-year horizons and three seconds otherwise.
|
|
|
|
The fixed ordering between user preferences and configurable optimization objectives, including the unconditional priority for at-risk loss prevention, is superseded by [ADR 0008](0008-user-controlled-planning-objectives.md); implementation of that decision is pending.
|
|
|
|
VacOptimizer resolves obligation rules exactly and jointly, then applies deterministic heuristic stages for at-risk loss, ordered preferences, complete public-holiday weeks, calendar gain, work-sequence quality, supporting placements, balance expiry, and dates in that order; complete holiday weeks therefore precede broader calendar-gain and work-sequence optimization. A completed plan does not claim mathematical global optimality. The dependency-free planner targets five seconds, returns `PlanningIncomplete` if those stages are interrupted, and stops after ten seconds. A HiGHS WebAssembly spike missed that hard limit on representative inputs even on the development machine, so no solver dependency is accepted. This supersedes ADR 0001.
|