- Implemented PlanningDurationService to provide an indicative wait time before calculation based on user input and calendar settings. - Introduced duration estimation logic that considers horizon dates, balances, and rules without triggering a calculation. - Enhanced user input component to display estimated duration using the new service. - Updated translation files to include new duration estimate strings in multiple languages. - Added tests for PlanningDurationService to ensure accurate duration estimation and calibration. - Refactored leave planner service to remove hardcoded deadlines and improve worker responsiveness.
12 lines
1.4 KiB
Markdown
12 lines
1.4 KiB
Markdown
# Stable Explanation, Original Trace, and Counterfactuals
|
|
|
|
The automatic planning deadline referenced below is superseded by [ADR 0006](0006-user-selected-horizons-and-cancellable-calculations.md), implemented by issue #59. Technical callers can still opt into an explicit planning-work budget; the user flow has no automatic cutoff.
|
|
|
|
VacOptimizer exposes one client-side calculation context. Its immutable submitted snapshot and planning outcome are independent from three explanation concerns:
|
|
|
|
- the stable plan explanation is derived from the final displayed plan and remains useful for complete or incumbent plans;
|
|
- the calculation trace is captured while the producing run executes, grouped by phase and atomic decision, and may become ready after the outcome;
|
|
- counterfactual date analysis is an explicitly hypothetical operation that removes only the selected final placement, or starts from a selected trace decision's exact pre-decision state, and never rewrites the plan or historical trace.
|
|
|
|
The public planning outcome is delivered as soon as planning work finishes. Trace capture and delivery have separate readiness/failure state, remain local to the latest calculation, and cannot turn a valid outcome into an explanation error. Counterfactual work is cancellable or ignored when its calculation identity is stale. The existing deterministic constraint-first planner and its planning-work deadline remain unchanged.
|