nessarandClaude Opus 5.5 676ea24410 test(benchmark): tighten the relative gate to the measured speed
After #302, the development machine's protocol takes about 41 seconds
instead of 232. The budget multipliers now add about 1.5 times headroom
to the new ratios (0.1 for typed obligations, which leaves room for
runner jitter), and the hang guard drops from 600 to 240 seconds, with
a 210-second test timeout: about three times the expected run on
srvhome, which is about 1.9 times slower than nessar-desktop.

Part of #286 and #302. The gate still needs a passing CI benchmark on
two runners.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 21:36:37 +02:00
nessarandClaude Opus 5.5 6c9ff4ae34 test(planning): rebuild the frozen engine from the obligation ranking
The frozen engine of the differential check is rebuilt from 8168137,
which plans from the best-ranked obligation solution, with the
documented build command. The check passes again, including its
cancelled asynchronous comparisons and generator-coverage assertions.
The calibration engine stays at a871f8f.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 21:18:40 +02:00
nessarandClaude Opus 5.5 8168137cd5 perf(planning): plan from the best-ranked obligation solution
With several obligation solutions, the planner ran the whole preference
chain on candidate solutions as previews: every solution after a
complete enumeration, or the eight best-ranked after a truncated window
search. It now orders all solutions by the existing pre-preference
ranking (active objectives, then tie-breaks, of each obligation-only
plan; equal ranks keep enumeration order) and runs the preference
stages once, on the first. If that run ends with earned leave available
only after its final merged time-off period, the stages restart on the
next solution, so a request that planned before never becomes a
conflict.

The loaded year drops from 43 to 5.5 seconds and typed obligations from
3.3 to 0.1 seconds, with byte-identical benchmark plans. Over the 5,000
seeded requests, 23 plans become worse (9 on a real objective) and 1
better; over 50 loaded-year-sized requests, 4 become worse on a real
objective. ADR 0010 records the decision; docs/benchmark/issue-302.md
records the comparison and the opt-in runner that reproduces it.

The frozen-engine check fails until the frozen engine is rebuilt from
this commit in the next one.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 21:18:06 +02:00
nessarandClaude Opus 5.5 aa6a0c6f1b perf(planning): copy only the debited balance when assigning a date
Assigning a date copied every balance and every earned activation.
Balances and activations are only edited right after a state copies
them, so the new state now shares them with its parent, except the
balance it debits. Placement copying is unchanged.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 20:08:12 +02:00
nessarandClaude Opus 5.5 9d9404c3db perf(planning): validate each optimization configuration once
Every objective evaluation revalidated its optimization configuration.
Rule normalization already validates each configuration once per
calculation and keeps its own copy, the presets are constant, and the
summed variant of a valid configuration stays valid, so the core now
scores them without revalidating. evaluateOptimization still validates
for other callers.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 20:03:22 +02:00
nessarandClaude Opus 5.5 b7ec411c92 perf(planning): yield between asynchronous slices without a timer
Each slice of the asynchronous adapter waited for a zero-delay timer:
about 1.1 ms in Bun, and at least 4 ms in browsers once timers nest.
Browsers now yield through a message-channel task. Bun runs port
messages ahead of timers and incoming worker messages, which starved
cancellation and heartbeats, so it yields with setImmediate. Both still
let queued cancellation and heartbeat tasks run between slices.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 19:58:40 +02:00
nessarandClaude Opus 5.5 2fcba758c8 perf(planning): retain the best valid plan more cheaply
Retaining a better valid plan reconciled its optimization provenance,
which evaluated every active objective once per credited placement with
that placement released. Only the credited objectives are compared, so
the released plan now evaluates just those and skips observing the
others. Retention also stops computing quality metrics that nothing
read. The retained plan and what Cancel returns are unchanged.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 19:50:58 +02:00
nessarandClaude Opus 5.5 0b0bb8f9a8 perf(planning): reuse the donor ranking across public-holiday weeks
The holiday-week stage ranked every placement as a donor once per
public-holiday week, although the ranking depends only on the plan. The
weeks of one plan now share each placement's released objectives; each
week still skips its own dates and walks the placements in the same
order with the same yields.

Part of #302.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 19:45:21 +02:00
nessarandClaude Opus 5.5 b356117263 test(benchmark): keep the a871f8f engine as a fixed calibration engine
The differential check's frozen bundle will be rebuilt for #302; the
relative gate keeps timing the unchanged a871f8f bundle so its ratios
stay comparable with the recorded history.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 19:14:28 +02:00
nessarandClaude Opus 5.5 282d9c6787 fix: report line-only coverage honestly and tighten Bun test helpers
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 41s
CI / build (push) Successful in 36s
CI / policy (pull_request) Successful in 10s
CI / validate (pull_request) Successful in 32s
CI / security (push) Successful in 1m3s
CI / test (push) Successful in 3m3s
CI / build (pull_request) Successful in 23s
CI / security (pull_request) Successful in 57s
CI / test (pull_request) Successful in 3m25s
CI / benchmark (push) Successful in 5m19s
CI / benchmark (pull_request) Successful in 4m48s
CI / images (push) Successful in 1m20s
CI / required (push) Successful in 3s
CI / images (pull_request) Successful in 54s
CI / required (pull_request) Successful in 1s
The generated HTML and Cobertura reports no longer show unmeasured
branch and function coverage as 100%. Poll and waitFor deadlines use
performance.now so frozen dates cannot make them loop forever, the
malformed-configuration test covers undefined again next to the empty
array, compose health checks honor PORT, and the migration spec lists
only what is still open.

Refs #291, #292, #293

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 16:10:29 +02:00
nessarandClaude Opus 5.5 dfe6d28d2b test(planning): make the checkpoint cancellation test deterministic
The cancelled stage takes about a millisecond, so under load the worker
could finish it before the cancel message arrived and report it as
completed. The real-worker harness now holds the worker after reporting
that stage until the cancel is delivered, keeping every assertion.

Refs #291

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 15:57:33 +02:00
nessarandClaude Opus 5.5 f74d744f9b feat(server): serve the client-only build with Bun
Angular's server build needs Node loader hooks that Bun does not apply,
and every route is client-rendered, so Angular now builds a client-only
bundle and a small Bun.serve server delivers it: hashed assets with the
one-year cache, index.html revalidated, extension-less routes falling
back to index.html, missing assets 404, traversal and malformed paths
rejected, and other methods 405. Express, @angular/ssr and the unused
hydration provider are removed. Both Docker stages use the pinned
oven/bun:1.4.3-alpine image without Node, and the health checks use
Bun's fetch.

Refs #292

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 13:50:05 +02:00
nessarandClaude Opus 5.5 94d57add2c test: run the suite and benchmark with Bun's native test runner
Replace Vitest with bun test across the whole suite. A preload compiles
components through Angular's JIT transform with inlined templates, sets
up jsdom, TestBed and zoneless change detection, and a small shim covers
the Vitest APIs bun:test lacks. Files run isolated, real-worker specs
spawn the running Bun, and line coverage from lcov is converted to the
existing HTML and Cobertura reports. The CI benchmark replaces its heap
cap with a container memory limit. Vitest, Jest, Nx and their Vite
configuration are removed.

Refs #291

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 13:40:42 +02:00
nessarandClaude Opus 5.5 cee67ce3df refactor(calendar): drop the unused projection horizon
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m2s
CI / build (push) Successful in 1m27s
CI / policy (pull_request) Successful in 11s
CI / security (push) Successful in 1m12s
CI / validate (pull_request) Successful in 1m21s
CI / benchmark (push) Successful in 4m10s
CI / test (push) Successful in 4m19s
CI / security (pull_request) Successful in 1m3s
CI / test (pull_request) Successful in 3m23s
CI / images (push) Successful in 1m34s
CI / build (pull_request) Successful in 34s
CI / required (push) Successful in 3s
CI / benchmark (pull_request) Successful in 7m13s
CI / images (pull_request) Successful in 1m56s
CI / required (pull_request) Successful in 2s
No caller read CalendarProjection.horizon, and with fixed months it no
longer described the listed months.

Refs #276

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:36:19 +02:00
nessarandClaude Opus 5.5 a472347a5e fix(calendar): keep declaration-entry months fixed while editing
Declaring a date at the edge of the planning period widened the
projection and inserted a disabled month above the grid. Declaration
entry now lists only the planning period's months, while selections
keep the connected-period widening.

Refs #276

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:29:31 +02:00
nessarandClaude Opus 5.5 feb651148e fix(planning): react only to calculations started by the mounted calendar
Re-mounting the calendar no longer records a duration sample or
announces the previous result, explanation or rejected explanation.
Starting a calculation during a cancellation announces loading and
keeps focus where it is. Only rejected explanation deliveries are
announced, as before. Replacement tests now replace a real plan.

Refs #275, #274

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:22:38 +02:00
nessarandClaude Opus 5.5 43677ff434 refactor(planning): drop the unreachable late worker message guard
release() already clears the worker handlers, so the released checks
inside them could never run. The lifetime test now states what it
checks: no handler is left for late messages.

Refs #277

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:22:38 +02:00
nessarandClaude Opus 5.5 502d561f6f refactor(calendar): encapsulate calendar projection and selection ranges
CalendarService.project returns the covered months together with the
projected selections, so month enumeration and selected-day rendering
share one projection horizon. SelectedDates is built once from the
complete range list and groups connected periods internally, exposing
read-only selection, boundary and day-type queries.

In declaration entry, months reached by adjacent declared or
non-working days are now shown, matching the projected selections.

Refs #276

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:18:33 +02:00
nessarandClaude Opus 5.5 5cb0b93339 refactor(planning): give planning calculations one state owner
PlanningCalculationService now builds the submitted request, owns the
pending and accepted calculation state, and delivers explanations for
the accepted calculation only. The duration estimator reads the same
request. The calendar and leave-balance summary consume the accepted
outcome instead of coordinating writable state on the input service.

Refs #275

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:11:37 +02:00
nessarandClaude Opus 5.5 b69b3c3690 refactor(planning): give planning workers one lifetime owner
Planning, counterfactual analysis and checkpoint explanation now share
one internal worker-job owner for creation, handler cleanup,
termination and supersession, and one request/response message
contract between the coordinator and the worker. Job-specific progress,
checkpoint recovery and completion rules stay explicit.

Refs #277

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:11:37 +02:00
nessarandClaude Opus 5.5 7fc2b33587 refactor(planning): remove the unused remaining-balance mirror
The summary and details already read the displayed plan's remaining
balances, so the writable mirror, its legacy conversion and the VacDay
classification/reason fields it alone populated are removed.

Refs #274

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 11:05:51 +02:00
nessarandClaude Opus 5.5 3bbe989eca test(benchmark): print a readable summary table
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m5s
CI / build (push) Successful in 1m38s
CI / policy (pull_request) Successful in 10s
CI / security (push) Successful in 1m19s
CI / test (push) Successful in 3m29s
CI / validate (pull_request) Successful in 1m42s
CI / benchmark (push) Successful in 4m13s
CI / security (pull_request) Successful in 56s
CI / build (pull_request) Successful in 1m42s
CI / test (pull_request) Successful in 3m8s
CI / images (push) Successful in 1m15s
CI / required (push) Successful in 1s
CI / benchmark (pull_request) Successful in 3m37s
CI / images (pull_request) Successful in 1m11s
CI / required (pull_request) Successful in 1s
Print the calibration and a Markdown table with one aligned row per
scenario as soon as it finishes: both planning times, mean, budget, ratio,
multiplier, outcome, placements, determinism and budget status. Write
directly to stdout so Vitest adds no per-line headers. The complete TSV
report still follows the table.

Refs #281, #285

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 02:09:54 +02:00
nessarandClaude Opus 5.5 cfdb28c90a ci(benchmark): size the hang guard for the slowest runner
CI / policy (push) Successful in 6s
CI / validate (push) Successful in 53s
CI / build (push) Successful in 1m18s
CI / policy (pull_request) Successful in 9s
CI / security (push) Successful in 1m12s
CI / validate (pull_request) Successful in 1m18s
CI / benchmark (push) Successful in 3m56s
CI / test (push) Successful in 4m6s
CI / build (pull_request) Successful in 36s
CI / security (pull_request) Successful in 1m5s
CI / test (pull_request) Successful in 3m2s
CI / images (push) Successful in 1m15s
CI / required (push) Successful in 1s
CI / benchmark (pull_request) Successful in 7m18s
CI / images (pull_request) Successful in 1m50s
CI / required (pull_request) Successful in 1s
The first PR run landed on srvhome, about 1.9 times slower than
nessar-desktop. The fixed 300-second timeout killed its protocol during the
loaded year, although every completed scenario was within its relative
budget. Raise the CI timeout to 600 seconds and the test timeout to 570
seconds so they only guard against hangs, and record the first CI-runner
ratios.

Refs #285

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 01:40:41 +02:00
nessarandClaude Opus 5.5 acdb19352a ci(benchmark): gate scenario speed relative to the runner
Before the protocol, time the frozen engine on the two-year scenario, best
of three, and fail any scenario whose mean planning time exceeds its
multiplier times that calibration. Multipliers come from development-machine
ratios with about 1.5x headroom until #286 tightens them. The 300-second
timeout stays only as a hang guard. The benchmark keeps running on push and
pull_request events because the push run gates image publication.

This replaces the absolute 300-second acceptance protocol named in #78.

Refs #285

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 00:45:28 +02:00
nessarandClaude Opus 5.5 68a9e33de6 perf(planning): prune candidates that cannot beat the protected prefix
Finalizing a candidate never moves or retypes a placement, so preference
results and calendar optimizations already have their final values before
it, and leave-balance optimizations do too when nothing can be earned.
Reject a candidate before finalizing when the first differing such
objective of the protected prefix is worse than the baseline. Leave-placement
objectives and earning contexts stop the walk.

The frozen-engine check now also compares cancelled asynchronous runs,
including checkpoints and retained incumbents. The loaded year drops from
48.5 s to 44.3 s; outcomes, explanations and final states are unchanged.

Refs #284

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 00:45:28 +02:00
nessarandClaude Opus 5.5 7890a03a74 perf(planning): update plan observations incrementally
Cache an immutable occupancy per placements map and derive a candidate's
time-off period groups, holiday-week completeness and placement tie key
from its parent when one date is added or removed. The from-scratch
computation stays as the test oracle and an opt-in shadow mode. A
fast-check property test compares both after every operation.

The loaded year drops from 66.5 s to 48.5 s and the protocol from 262.0 s
to 193.7 s. Outcomes, explanations and final states stay identical.

Refs #283

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 00:45:28 +02:00
nessarandClaude Opus 5.5 87d72064be refactor(planning): consolidate plan observations in one module
Move time-off periods, work sequences, public-holiday weeks, balance
observations, the placement list and both tie keys into
plan-observations.ts. The code moves without behavior changes; all seven
benchmark scenarios produce byte-identical outcomes, explanations and final
states, and the frozen-engine check passes. Benchmark timings stay within
noise.

Refs #282

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 23:47:34 +02:00
nessarandClaude Opus 5.5 24c35542a8 test(benchmark): report each scenario as it finishes
Print the report header before the measured runs and each scenario's rows
as soon as its repetitions complete, so a timed-out job still shows the
finished scenarios. The final report, scenarios, warm-ups, repetitions,
assertions, heap limit and timeout are unchanged.

Refs #281

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 23:36:11 +02:00
nessarandClaude Opus 5.5 4d26e65672 test(planning): compare the engine against a frozen engine on random requests
Bundle the planning core at a871f8f (develop after PR #278) as a frozen
fixture and compare it with the current engine on 5,000 seeded random
requests. Outcomes, stable explanations, explanation errors and final-state
snapshots must be strictly deep-equal. Requests cover obligations,
preferences, IF_THEN and TIME_WINDOW rules, earned entitlements, composed
optimization rules, declared days, year boundaries and public holidays.

Refs #280

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 23:30:30 +02:00
nessarandClaude Opus 5.5 c6610cd633 perf(planning): reject impossible mandatory moves before copying
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 22:04:28 +02:00
nessar 433a8b0ade perf(planning): reuse immutable non-working date counts 2026-10-16 21:19:58 +02:00
nessar c7e7abcd24 perf(planning): build placement date keys directly 2026-10-16 21:03:36 +02:00
nessar cbde23f572 perf(planning): restore the integrated benchmark gate
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m23s
CI / test (push) Successful in 3m17s
CI / benchmark (push) Failing after 5m52s
CI / build (push) Successful in 1m31s
CI / security (push) Successful in 1m39s
CI / images (push) Skipped
CI / policy (pull_request) Successful in 7s
CI / validate (pull_request) Successful in 1m11s
CI / test (pull_request) Successful in 3m17s
CI / benchmark (pull_request) Failing after 5m57s
CI / build (pull_request) Successful in 1m30s
CI / security (pull_request) Successful in 1m40s
CI / images (pull_request) Skipped
CI / required (push) Failing after 2s
CI / required (pull_request) Failing after 1s
Reduce objective evaluation and calendar allocation work while preserving planner outcomes and deterministic explanations. Restore required benchmark gating and record the unchanged protocol, differential checks, and browser evidence for #78.
2026-10-16 14:01:32 +02:00
nessar 56577d23b5 test(planning): verify integrated planning after trace removal
CI / validate (push) Successful in 44s
CI / build (push) Successful in 40s
CI / policy (push) Successful in 6s
CI / policy (pull_request) Successful in 7s
CI / validate (pull_request) Successful in 1m19s
CI / test (push) Successful in 1m52s
CI / benchmark (push) Failing after 5m29s
CI / test (pull_request) Successful in 3m22s
CI / security (pull_request) Failing after 12m15s
CI / build (pull_request) Failing after 14m33s
CI / benchmark (pull_request) Failing after 17m21s
CI / security (push) Failing after 19m29s
CI / images (pull_request) Skipped
CI / images (push) Skipped
CI / required (push) Failing after 1s
CI / required (pull_request) Failing after 1s
2026-10-15 21:45:58 +02:00
nessar d9d9befa12 refactor(planning): remove the original decision trace
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m15s
CI / test (push) Successful in 3m18s
CI / benchmark (push) Failing after 5m53s
CI / build (push) Successful in 1m23s
CI / security (push) Successful in 7m6s
CI / policy (pull_request) Successful in 7s
CI / validate (pull_request) Successful in 1m9s
CI / build (pull_request) Successful in 43s
CI / test (pull_request) Successful in 3m19s
CI / images (push) Successful in 3m7s
CI / required (push) Successful in 2s
CI / benchmark (pull_request) Failing after 5m28s
CI / security (pull_request) Successful in 6m37s
CI / images (pull_request) Successful in 3m18s
CI / required (pull_request) Successful in 1s
2026-10-15 20:42:33 +02:00
nessar 6811142299 feat(planning): make optimization rules composable
Evaluate explicit, ordered optimization configurations through one shared
planner model. Add six editable presets, durable one-time legacy migration,
and consistent completed and cancelled plan provenance.

Include functional regressions and the agreed trace-removal and benchmark
follow-up specs. Performance acceptance remains in #78 under unchanged gates.

Refs: #70, #71, #72, #73, #74, #75, #76, #77, #78
2026-10-10 16:07:34 +02:00
nessar 6777cbc282 feat(ui): use Material datepickers for planning horizon 2026-10-08 06:49:06 +00:00
nessar 31d4333783 feat(ui): configure planning horizon alongside leave balances 2026-10-08 06:49:06 +00:00
nessar 8fcd53fc32 ci: allow the complete benchmark to finish on shared runners 2026-10-08 00:54:49 +02:00
nessar 06adeb12d6 feat(stats): count holidays connected to weekends (#68) 2026-10-07 23:12:06 +02:00
nessar da08ee054d feat(stats): show gross earned leave by rule (#67) 2026-10-07 22:58:15 +02:00
nessar 3fbf9c3172 feat(stats): show work and time-off lengths (#66) 2026-10-07 22:39:05 +02:00
nessar d9f3f8d34a feat(stats): open calculated plan statistics (#65) 2026-10-07 22:12:56 +02:00
nessar 3dc601982a feat: enhance user input component with new styling and functionality
- Added informational styling to warning cards in user input component.
- Improved remaining days details and history display with new computed properties.
- Updated user input service to manage planning outcomes and traces more effectively.
- Enhanced leave planner service to classify remaining balances with detailed reasons.
- Expanded translation service to support new balance reasoning and suggestions.
- Updated translations for multiple languages to reflect new features and terminology.
2026-10-07 21:49:33 +02:00
nessar 9851edf906 feat(planning): #62 #63 #64 enhance leave planner with calculation date and entitlement details
- Introduced calculationDate in various service interfaces and snapshots to track the date of planning calculations.
- Added futureEntitlement and includedEntitlement fields to the translation service and respective language files for better user feedback.
- Updated leave-planner.worker to handle calculationDate and declaredDays in requests.
- Enhanced tests to ensure proper handling of calculation dates and artifact retention during planning processes.
- Improved snapshot and explanation outputs to include calculation date for clarity in planning results.
2026-10-07 19:22:46 +02:00
nessar 036a8c0e1e #61 2026-10-07 00:28:29 +02:00
nessar bc8570d8ca feat: add PlanningDurationService for estimating planning duration
- Implemented PlanningDurationService to provide an indicative wait time before calculation based on user input and calendar settings.
- Introduced duration estimation logic that considers horizon dates, balances, and rules without triggering a calculation.
- Enhanced user input component to display estimated duration using the new service.
- Updated translation files to include new duration estimate strings in multiple languages.
- Added tests for PlanningDurationService to ensure accurate duration estimation and calibration.
- Refactored leave planner service to remove hardcoded deadlines and improve worker responsiveness.
2026-10-05 17:06:17 +02:00
nessar 2edf2004f5 feat(planner): implement cancellation for planning calculations
- Refactor leave-planner.worker.ts to support cancellation of ongoing calculations.
- Introduce `calculatePlanningAsyncInternal` for asynchronous planning calculations.
- Add cancellation handling in the worker message event.
- Update planning-date.ts with new utility functions for date manipulation.
- Extend translation-service.ts and translation files (en.json, de.json, es.json, fr.json) to include new strings related to planning horizon and cancellation.
- Create documentation for the cancellation feature in planner-cancellation.md.
- Add unit tests for cancellation functionality in leave-planner-cancellation.spec.ts and leave-planner.worker.spec.ts.

#57 #58
2026-10-05 15:34:07 +02:00
nessar f94ed3fc50 test: update calendar year planning tests for user interaction and state management 2026-10-05 10:08:51 +02:00
nessar 6681d438dc style: update scrollbar styling for mat-dialog-content 2026-10-05 09:41:46 +02:00