Commit Graph
20 Commits
Author SHA1 Message Date
nessarandClaude Opus 5.5 68a9e33de6 perf(planning): prune candidates that cannot beat the protected prefix
Finalizing a candidate never moves or retypes a placement, so preference
results and calendar optimizations already have their final values before
it, and leave-balance optimizations do too when nothing can be earned.
Reject a candidate before finalizing when the first differing such
objective of the protected prefix is worse than the baseline. Leave-placement
objectives and earning contexts stop the walk.

The frozen-engine check now also compares cancelled asynchronous runs,
including checkpoints and retained incumbents. The loaded year drops from
48.5 s to 44.3 s; outcomes, explanations and final states are unchanged.

Refs #284

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 00:45:28 +02:00
nessarandClaude Opus 5.5 7890a03a74 perf(planning): update plan observations incrementally
Cache an immutable occupancy per placements map and derive a candidate's
time-off period groups, holiday-week completeness and placement tie key
from its parent when one date is added or removed. The from-scratch
computation stays as the test oracle and an opt-in shadow mode. A
fast-check property test compares both after every operation.

The loaded year drops from 66.5 s to 48.5 s and the protocol from 262.0 s
to 193.7 s. Outcomes, explanations and final states stay identical.

Refs #283

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 00:45:28 +02:00
nessarandClaude Opus 5.5 87d72064be refactor(planning): consolidate plan observations in one module
Move time-off periods, work sequences, public-holiday weeks, balance
observations, the placement list and both tie keys into
plan-observations.ts. The code moves without behavior changes; all seven
benchmark scenarios produce byte-identical outcomes, explanations and final
states, and the frozen-engine check passes. Benchmark timings stay within
noise.

Refs #282

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 23:47:34 +02:00
nessarandClaude Opus 5.5 c6610cd633 perf(planning): reject impossible mandatory moves before copying
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 22:04:28 +02:00
nessar c7e7abcd24 perf(planning): build placement date keys directly 2026-10-16 21:03:36 +02:00
nessar cbde23f572 perf(planning): restore the integrated benchmark gate
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m23s
CI / test (push) Successful in 3m17s
CI / benchmark (push) Failing after 5m52s
CI / build (push) Successful in 1m31s
CI / security (push) Successful in 1m39s
CI / images (push) Skipped
CI / policy (pull_request) Successful in 7s
CI / validate (pull_request) Successful in 1m11s
CI / test (pull_request) Successful in 3m17s
CI / benchmark (pull_request) Failing after 5m57s
CI / build (pull_request) Successful in 1m30s
CI / security (pull_request) Successful in 1m40s
CI / images (pull_request) Skipped
CI / required (push) Failing after 2s
CI / required (pull_request) Failing after 1s
Reduce objective evaluation and calendar allocation work while preserving planner outcomes and deterministic explanations. Restore required benchmark gating and record the unchanged protocol, differential checks, and browser evidence for #78.
2026-10-16 14:01:32 +02:00
nessar d9d9befa12 refactor(planning): remove the original decision trace
CI / policy (push) Successful in 7s
CI / validate (push) Successful in 1m15s
CI / test (push) Successful in 3m18s
CI / benchmark (push) Failing after 5m53s
CI / build (push) Successful in 1m23s
CI / security (push) Successful in 7m6s
CI / policy (pull_request) Successful in 7s
CI / validate (pull_request) Successful in 1m9s
CI / build (pull_request) Successful in 43s
CI / test (pull_request) Successful in 3m19s
CI / images (push) Successful in 3m7s
CI / required (push) Successful in 2s
CI / benchmark (pull_request) Failing after 5m28s
CI / security (pull_request) Successful in 6m37s
CI / images (pull_request) Successful in 3m18s
CI / required (pull_request) Successful in 1s
2026-10-15 20:42:33 +02:00
nessar 6811142299 feat(planning): make optimization rules composable
Evaluate explicit, ordered optimization configurations through one shared
planner model. Add six editable presets, durable one-time legacy migration,
and consistent completed and cancelled plan provenance.

Include functional regressions and the agreed trace-removal and benchmark
follow-up specs. Performance acceptance remains in #78 under unchanged gates.

Refs: #70, #71, #72, #73, #74, #75, #76, #77, #78
2026-10-10 16:07:34 +02:00
nessar 3fbf9c3172 feat(stats): show work and time-off lengths (#66) 2026-10-07 22:39:05 +02:00
nessar 3dc601982a feat: enhance user input component with new styling and functionality
- Added informational styling to warning cards in user input component.
- Improved remaining days details and history display with new computed properties.
- Updated user input service to manage planning outcomes and traces more effectively.
- Enhanced leave planner service to classify remaining balances with detailed reasons.
- Expanded translation service to support new balance reasoning and suggestions.
- Updated translations for multiple languages to reflect new features and terminology.
2026-10-07 21:49:33 +02:00
nessar 9851edf906 feat(planning): #62 #63 #64 enhance leave planner with calculation date and entitlement details
- Introduced calculationDate in various service interfaces and snapshots to track the date of planning calculations.
- Added futureEntitlement and includedEntitlement fields to the translation service and respective language files for better user feedback.
- Updated leave-planner.worker to handle calculationDate and declaredDays in requests.
- Enhanced tests to ensure proper handling of calculation dates and artifact retention during planning processes.
- Improved snapshot and explanation outputs to include calculation date for clarity in planning results.
2026-10-07 19:22:46 +02:00
nessar 036a8c0e1e #61 2026-10-07 00:28:29 +02:00
nessar bc8570d8ca feat: add PlanningDurationService for estimating planning duration
- Implemented PlanningDurationService to provide an indicative wait time before calculation based on user input and calendar settings.
- Introduced duration estimation logic that considers horizon dates, balances, and rules without triggering a calculation.
- Enhanced user input component to display estimated duration using the new service.
- Updated translation files to include new duration estimate strings in multiple languages.
- Added tests for PlanningDurationService to ensure accurate duration estimation and calibration.
- Refactored leave planner service to remove hardcoded deadlines and improve worker responsiveness.
2026-10-05 17:06:17 +02:00
nessar 2edf2004f5 feat(planner): implement cancellation for planning calculations
- Refactor leave-planner.worker.ts to support cancellation of ongoing calculations.
- Introduce `calculatePlanningAsyncInternal` for asynchronous planning calculations.
- Add cancellation handling in the worker message event.
- Update planning-date.ts with new utility functions for date manipulation.
- Extend translation-service.ts and translation files (en.json, de.json, es.json, fr.json) to include new strings related to planning horizon and cancellation.
- Create documentation for the cancellation feature in planner-cancellation.md.
- Add unit tests for cancellation functionality in leave-planner-cancellation.spec.ts and leave-planner.worker.spec.ts.

#57 #58
2026-10-05 15:34:07 +02:00
nessar 01c87d1e44 feat(planning): complete verified explanations and trace delivery (#46)
Implement plan explanations, original decision traces, calendar replay, and worker counterfactual analysis. Preserve incomplete checkpoints and conflict reasons, with accessible navigation and localized comparison details.

Keep planning outcomes independent of tracing and bound worker delivery with receiver acknowledgements. Retain complete candidate history while releasing temporary buffers and benchmark references.

Validated with 201 tests, app/spec type checks, lint, production build, baseline outcome comparisons, and repeated loaded browser measurements. Document performance and remaining limits.
2026-10-03 16:26:56 +02:00
nessar c9dbe82b79 fix(planning): complete explanation and trace behavior (#46) 2026-10-02 15:05:30 +02:00
nessar f1f08356df feat(benchmark): enhance benchmark documentation and add emulated run details
fix(benchmark): update deterministic checks and improve measurement accuracy

fix(service): refine candidate recording and enhance balance assignment logic

test(service): add test for balance recording with preference assignment
2026-09-25 14:07:00 +02:00
nessar d7a13b0b1e feat(planning): explain and trace planning decisions 2026-08-31 00:02:45 +02:00
nessar 31314f3969 fix(planning): prioritize complete holiday weeks 2026-08-30 17:16:30 +02:00
nessar 7ceaf1a57a feat(planning): implement constraint-first leave planner 2026-08-28 22:44:14 +02:00